Exterior Remodeling in Pasadena, California
Turf, pavers, lighting and full backyard builds in Pasadena. Free on-site estimates.
What We See in Pasadena
Pasadena is one of the few places where we sometimes begin by looking at the house longer than the yard. A Craftsman, Spanish-style home and contemporary rebuild should not all receive the same paver pattern, border and outdoor layout. NexGen uses the architecture as a filter before recommending what belongs around it.
As the city moves toward the foothills, grading and water management begin to play a larger role too. Mature landscaping can be worth designing around instead of replacing simply because construction would be easier without it. Pasadena is at its best when an exterior remodel improves the home without making people wonder why the backyard belongs to a different house.
What We Do in Pasadena
Pasadena is inside our regular service area in Los Angeles County. Estimates are free, done on site, and we bring real turf and paver samples so you can decide holding the product.
4.9★
Google Rating
Free
On-site Estimate
2-Year
Warranty
CSLB
#1127800
What Pasadena Homeowners Say
We hold a 4.9 star rating on Google across LA, the Valley, Santa Clarita & Ventura. The profile is public, so you can read every review yourself rather than the three we would have picked.
Schedule Your Free Estimate in Pasadena
Free, no-obligation. Most projects start within 2 weeks.
Paver and Turf Work in Pasadena
The detail that is specific to Pasadena is above. These pages carry the rest, written once so it stays correct everywhere.
Paver installation in Pasadena
Base depth, permits, and what we have actually built nearest to Pasadena.
What will it cost?
Work up a range for your own square footage before anyone visits.
Artificial turf
How the base is built, what the infill does, and how long installs take.
Licence and warranty
CSLB #1127800, valid across Los Angeles County, plus the 2-year workmanship warranty.
Ready to Transform Your Yard?
Get a free, no-obligation estimate. Most projects start within 2 weeks.